« Back / Horse / Headcollars & Lead Ropes / Lead Ropes

B Vertigo B Vertigo Hardwick Lead

RRP: -31% off
£8.99
RRP: £12.99
Price includes VAT Plus shipping
( 1 )
We celebrate with you - 21 years of Horze!
Save 21% on the Horze brand &
Get 11% off almost all other Brands

+Every 21st order for free!
Copy code: B-DAY
£100 is the minimum order. Cannot be combined with other vouchers. If you return one or several of the items, we will refund the discounted price of the returned item. Does not apply to excluded products (Information on product pages). Every 21st order wins - maximum refund amount is £150. Differences will not be paid out. All purchases in the Horze app or online shop will be entered into the competition. Customer service will contact the winners after the end of the campaign on 28/04/2024. Prizes are not transferable, refundable or exchangeable for cash or other prizes.
Colour: Fig Wine Red
Fig Wine Red B Vertigo Hardwick Lead
One size
Size Chart
Size Height
P 10"
C 14.2"
F 15.2"
XF 16.3"
Back

These sizes correspond to the height of the horse, and are intended as a guide only.

Horze logo
Shipping by Horze
COLLECT POINTS with this item as a Horze Club member.
Free delivery
Free delivery on all orders over 99 GBP
30 Days Return Policy

Description

Pretty lead in soft colours.

Our B Vertigo Hardwick lead is made from durable braided rope. The silver snap hook closes safely. The pretty colours can be easily incorporated into your tack. Combine this lead with the matching V Vertigo Hardwick halter for a full set.

Features:

  • Braided rope
  • Soft colours
  • Silver snap hook

Technical description:

Polyester.

Washing instructions:

Hand wash in cold water.

Product ID: 22637

Read Reviews:

Colour: