Buy Horze Extra Long Lead | horze.co.uk
Ultimate Discount: 30% Off on Horze & B Vertigo Tights!
Save now
New

Extra Long Lead

£8.99
Price includes VAT
Pink Horze Extra Long Lead horze
Light Blue Horze Extra Long Lead horze
Green Horze Extra Long Lead horze
Dark Red Horze Extra Long Lead horze
Dark Grey Horze Extra Long Lead horze
Dark Blue Horze Extra Long Lead horze
Horze Extra Long Lead
£8.99
Price includes VAT
Available now
The item is in stock for you
  • Free Shipping on all orders over £69
  • Free Returns
Horze Extra Long Lead
Description

Description

An extra long lead for everyday use.


This lead is made from durable braided rope, and equipped with a strong snap hook in satin finish.


Features:


  • Extra long
  • Durable material
  • Big gold-coloured snap hook
  • Various colours

Technical description:


100% Polyester. Length: 2,5m.


Washing instructions:


Rinse in cold water. Air dry.


Product ID: 22621

Read more

This product is currently in our stock. If you order today, we will pick & pack it within 24 hours (during work days) and ship it to you. You should have the product within some days.

Read more about shipping cost and shipping timing.

Our policy is simple. If you're not 100% totally, completely, and unconditionally satisfied for any reason whatsoever, return it! We'll happily accept packages within 30 days of the sale date and we'll give you a complete refund. All we ask is that the product is not used or expired, is in the same condition you received it and is in the original box and/or packaging. At the moment you have to pay for the return shipping cost.

Read more about our return policy

Rating
5 / 5
Review this product

Tell us your opinion about this product

Write a review

Read Reviews:

Buy together

Total price:

Added to Cart
Horze Extra Long Lead
Product ID:
Cart total:
There are only items in stock. You already have items in your basket. The remaining products have been added to your cart.